QUOTECHECKER.NET

Example report

Featured example

QuoteChecker.net — Thorough Check report
Heat pump — Remeha Elga Ace Hybrid 6kW
Example
Client
The Jansen family
Provider
WarmtepompCompany B.V. — Hoofddorp
Report
5 June 2025

Summary

This quote is transparently structured with clear insight into all costs, materials and work. The total net investment amounts to €6.476,41 after subsidy. The quote uses A-brands (Remeha) and stands out for its clear warranty terms. Points of attention are the provider's limited online reputation and the absence of a pre-installation inspection.

5 positive findings 3 points of attention 1 risk
7.14 out of 10
Average score

Cost overview

Component Excl. VAT
Heat pump Remeha Elga Ace Monoblock 6kW €7.200,00
Smart thermostat Remeha eTwist €331,50
Buffer tank including differential pressure controller €331,00
Connection couplings €118,00
Assembly, transport, lift/scaffolding & indoor work included
App support & commissioning included
Discount −€500,00
Subtotal excl. VAT €7.480,50
VAT 21% €1.570,91
Total incl. VAT €9.051,41
Subsidy −€2.575,00
Net investment €6.476,41

Score by category

Price
7
Warranty
8
Sustainability
8
Brand recognition
9
Provider reputation
6
Maintenance costs
6
Delivery terms
7
Average
7.14

Findings

Price in line with market
The all-in price offered of €9.051,41 incl. VAT is in line with the market for a certified installation with A-brand components.
Installation fully included
Assembly, transport, scaffolding/lift, indoor and outdoor work and app support are included without separate items.
Transparent cost structure
No provisional or lump-sum items. Each component is individually specified with clear amounts.
Subsidy processed
The subsidy of €2.575,00 has already been deducted in the quote. Net investment: €6.476,41.
5-year warranty (product + installation)
Both warranties are clearly stated. No demonstrable exclusions in the quote itself.
Provider reputation limited verifiable
Only 29 Google reviews (4.2/5) found. Positive impression, but small sample. InstallQ + STEK certification present.
Annual maintenance obligation unclear
A free service plan for 5 years is mentioned, but no information on whether annual maintenance is required to retain the warranty.
General terms and conditions not enclosed
The GTC "apply" but are not supplied. Request the complete GTC before signing.
Technical inspection does NOT take place in advance
The on-site survey follows after agreement. Risk of later additional charges in complex situations (meter cupboard, pipework, scaffolding).

Recommended questions for the provider

Dear Sir or Madam,

Thank you for your clear and detailed quote. For further clarification, I kindly ask you to address the following points:

  1. 1. Could you still send the general terms and conditions?
  2. 2. Are there maintenance obligations to retain the warranty? If so, by whom and at what cost?
  3. 3. Is the stated price final, even in complex or non-standard installation situations?
  4. 4. How are any unforeseen additional costs communicated before execution?
  5. 5. After the technical survey, can you confirm in writing which (additional) costs apply?

Kind regards,
QuoteChecker.net

QuoteChecker.net — Independent quote analysis Thorough Check report · 5 June 2025

Get your quote reviewed now

Avoid regret later. An independent assessment from just $5 — no hidden costs.

Start Quick Check →